1. 尊龙凯时人生就是搏!(中国)官方

      EN

      开门红!新年第一船交付 !First Delivery in the Year of Dragon

      发布时间:2024-02-06 16:40作者来源:尊龙凯时人生就是搏!浏览次数:0

      近日,尊龙凯时人生就是搏!成功交付2024年的第一艘船!这是与芬兰船东Langh Ship Oy Ab公司合作的第二艘7800吨多用途船。这次交付加强了芜船与芬兰船东之间的友好关系,展示了芜船项目团队勤奋、高效、努力的专业精神。


      Recently, Wuhu Shipyard successfully delivered the second 7800T MPV in cooperation with the Finnish shipowner Langh Ship Oy Ab! It is also the first vessel to be delivered by Wuhu Shipyard this new year. This delivery highlights the depth and breadth of the friendly cooperation between each other, and also demonstrates the spirits of diligence, efficiency and hard work of the Wuhu Shipyard’s project team.



      多用途船的建造是一项复杂的工程。从设计到建造,每一个环节都需要专业的技术和高度的协调能力。芜船项目团队充分发挥专业知识,运用丰富经验,各种技术难题迎刃而解,船东各项刚性要求一一满足。他们的辛勤努力和高效工作确保了这次的顺利交付。
      The construction of this multi-purpose vessel is complicated, which requires a high degree of technical and coordinating ability at all stages. The company's project team applied their knowledge and experience during the design and fabrication process to ensure that the quality and performance of the vessel reached the international advanced level.Various technical issues have been solved smoothly, and all strict requirements of the shipowner have been met accordingly. Their hard work and high efficiency laid a solid foundation of this smooth delivery.
      该船的总组搭载更是整船建造过程中最大的亮点。
      The pre-erection of the vessel is the most attracting part of the whole ship construction process.
      项目团队总结首制船的建造经验,优化总组方式,由原先的12个总段优化到5个总段(包括上建总段),实现了货舱、机舱、艏部、上建区域模块化建造。
      Reasonable planning in the pre-erection stage. By summarizing the construction process of the first vessel of 7800-ton series, the project team optimized the pre-erection mode so that the grand blocks finalized from 12 to 5 (including the accommodation section), and realizing the modular construction of the whole vessel.
      利用总段预搭载模式实现货舱总段无余量搭载。货舱总段在总组前,对总组场地充分测算,合理定盘以实现货舱总段前后总组,并利用统一中心线、统一基线来定位。在总段焊后进行余量切割,不仅实现船台无余量搭载,节省吊车松钩时间,而且减少余量切割过程中脚手架和高空车作业的工作量。
      In line with the pre-erection mode, the grand block of the cargo hold to be zero-allowance assembled. Before that, the site of the erection was fully calculated and reasonably fixed. The unified center line and unified baseline were used to locate the blocks, and the margin was cut after the grand block was welded. It can realize the zero-allowance assembly on the slip, save the usage time of the crane, and reduce the use of scaffolding and high-altitude vehicles.
      机舱及艏部在总组阶段实现完整的总段,总组阶段最大程度地实现机舱、艏部总段的舱室完整性,不仅为后期船台交机和外板交涂节约了时间,缩短了船台周期,而且机舱总段的完整性相关数据的收集,也为后续船在总组平台交机提供了有力依据。
      Realization of complete grand block of engine room and that of the forward section at the stage of pre-erection where the integrity of the structures to be maximum achieved , which not only saves the time of the shaft alignment on the slipway and painting for the outer plate at the later stage, further to shorten the cycle of slipway, but also benefits the relevant data gathering regarding the integrity of the grand block of the engine room  which could provide a strong basis for the subsequent vessels shaft alignment on the platform during the pre-erection.
      优化上建总段的总组方式,将上建总段与艉楼分段总组,不仅实现了底层上建的设备提前安装,而且为整个上建总段实现壳、舾、涂一体化提供充分保障。
      Optimizing the pre-erection of the accommodation section, to erect the grand block of the accommodation and the poop deck block, which not only contributes to realizing the early installation of the equipment in the lower layers of the accommodation, but also providing sufficient guarantee for the integration of outfitting and painting for the whole accommodation section.
      LNG罐体实现一次吊装安装到位。通过总结首制船LNG罐体吊装过程遇到的问题点,与设计沟通后,提前将分段的障碍结构拆除,并在基座安装过程做好充分准备,为一次吊装成功提供有力支撑。最终本船的船台周期大幅缩短,实现58天下水记录。
      LNG tank was lifted, located and installed at one time: after summarizing the problems encountered during the lifting of LNG tank on the first vessel and communicating with the design department, the project team decided to remove the obstacle structures in advance. Sufficient preparations were also made during the installation of foundations to provide strong support for the success of the one time lifting. The final realization was achieving a record of 58-day cycle on the slipway, a significant reduction there.
      试航结束后,为了早日交付船东运营,项目组吃住在码头,加班加点处理遗留问题,积极主动对船员进行了所有系统操作的培训。整船验收后,建造质量获得了船东充分肯定。
      After the sea trial, in order to deliver the vessel as soon as possible, the project team chose to live and work at the dock from day and night to deal with the remaining comments, and actively trained the crew on all operations. After the acceptance of the whole vessel, the construction quality was fully affirmed by the shipowner.
      这次交船期间,船厂还邀请了船东劳拉夫人,以及她的家人和朋友,一起来参加命名仪式,参观船厂。这次交船不仅是一次项目合作,更是一场富有文化内涵的交流盛宴。船东一行参观了公司的智能下料、加工中心以及管子流水线,对这些现代化的船舶制造流程极为赞赏。特别是孩子们,对公司的智能制造设备表达了极大的兴趣,他们的好奇心和探索精神必将为两方合作注入新的活力与动力。
      During the delivery time, the ship owner of Langh Ship, Mrs Laura, her family and frends were invited to attend the naming ceremony and visit the shipyard. This coming was not merely a cooperation of the project, but a cultural feast with communication. The guests experienced the shipyard's intelligent cutting and processing workshop and production lines. The children, in particular, expressed great interest in modern manufacturing process. Their curiosity and exploratory spirit will surely inject fresh vitality and power into the both parties’ future cooperation.    



      这次交流为双方建立了更深层次的友谊。双方不仅在船舶制造技术、市场需求等方面进行了深入探讨,还分享了各自国家的文化特色。尊龙凯时人生就是搏!市政府领导对船东团队的到访非常重视,市委副秘书长苏文中先生更是亲自安排并出席欢迎晚宴,与船东一家亲切交流,畅谈未来合作。
      The visit has built a profound level of friendship between the two sides. They had in-depth discussions on shipbuilding technology and market demand as well as shared the cultural characteristics of their own countries. The leaders of Wuhu government attached great importance to their coming. Mr.Su Wenzhong, the deputy Secretary-General of Wuhu Municipal Committee, personally arranged the reception dinner and exchanged views with Laura's family, discussing their bright cooperation in the future.
      这次交付为后续系列船的建造夯实了技术及建造基础,彰显了公司的建造能力和交船能力,巩固公司在高附加值型船的市场地位。芜船还将以此次交船为契机,在新的一年里,继续总结经验、发挥优势,以更优异的成绩为龙年献礼!
      This delivery has laid a solid foundation for the subsequent series of vessels in technique and construction, demonstrated Wuhu Shipyard's extraordinary ability to build and deliver vessels, and consolidated its advantageous market position in high value-added vessels. Wuhu Shipyard will also take this successful delivery as an opportunity, continue to sum up experience, take full advantages, make more achievements in the Year of the Dragon!




      Copyright © 2018 尊龙凯时人生就是搏!有限公司 保留所有权利 皖ICP备10207133号-2 隐私条款
      隐私条款

      为确保你个人数据的安全,我们向尊龙凯时人生就是搏!员工传达了公司的隐私和安全准则,并在公司内部严格执行隐私保护措施。我们设立了个人信息保护专职部门,将按照本政策保护你的个人信息。如你有关于网络信息安全的投诉和举报,或你对本政策、我们的隐私保护措施、你的信息的相关事宜有任何问题、意见或建议,请通过以下电话与我们的客服部门进行联系:

      联系电话:【0553-3935161】 

      免责声明
      免责声明

      本网站的信息(订阅信息包括在内)仅供您的参考,不构成本公司对网站访问者和信息接收者的任何承诺。网站访问者和信息接收者不应将本网站信息作为其作为或不作为的行为依据。为了便利访问者的目的而可能设置的链接,并不意味着本公司与该链接网站存在任何合作关系,也不意味着对访问该等网站任何明示、默示的担保或责任。


      本公司一直以来尊重并致力于对知识产权的保护,本网站所包含文字、图片等全部信息可能涉及版权或其它民事权利问题,请勿擅自转载或者使用,本网站并未对使用该等信息进行任何形式的许可和保证,由此产生的任何法律责任,与本公司无关;本网站所包含文字、图片等全部信息亦仅用于介绍本公司和促进了解的目的,如您认为相关内容涉及您的自有知识产权,请按下列方式与我们联系,接到您的通知并核实有关情况属实后,网站会第一时间删除相关内容。关于本网站,您如有何等问题,请与尊龙凯时人生就是搏!有限公司联系。

      联系电话:0553-3935161

      技术支持:纳创科技
      友情链接: